Ball Spline Installation: Housing Fit, Mounting and Nut Insertion
November 4, 2026 · 6 min read
A ball spline installation needs three interfaces to work together: the nut body in its housing, the nut’s torque connection to the machine, and the nut on its matching spline shaft. Check each interface before tightening the assembly. A housing that locates the nut does not, by itself, provide every restraint the installation needs.
This guide covers SLF, SLT, SOF and SOT mounting, housing bore classes and controlled nut insertion. Use the SL series and SO series dimension tables with the approved assembly drawing for the selected size.
Specify the housing bore around the nut body
The housing bore receives the spline nut’s outside diameter, D. It is a different interface from the shaft diameter, d. Putting a shaft tolerance beside the housing bore dimension can therefore specify the wrong fit even when both dimensions appear on the same catalogue page.
The SL/SO installation guidance specifies H7 for general housing bores and J6 for precision applications. It describes a transition fit as the normal arrangement, with a clearance fit acceptable where accuracy requirements are lower. Keep the selected bore class with the nominal bore diameter on the drawing.
| Application | Housing bore class | Drawing check |
|---|---|---|
| General use | H7 | Dimension the bore from the selected nut body D. |
| Precision use | J6 | Review the bore and mating nut limits together. |
A bore class alone does not define the complete fit. Review the nut’s specified outside-diameter limits as well as the housing limits. The numerical deviations depend on the nominal diameter; H7 and J6 are not fixed micrometre allowances for every size. Confirm the selected fit before machining, particularly for a thin housing or an existing replacement bore.
Separate torque restraint from axial retention
SLF and SOF nuts attach through their integral flanges. SLF uses a round flange and SOF a square flange. Match the selected flange pattern, mounting holes and seating face to the drawing; a shared nominal size does not establish a shared bolt pattern.
SLT and SOT have cylindrical bodies with keyway mounting interfaces. Review the key and housing keyway as the torque connection. The catalogue’s cylindrical mounting example uses a C-clip for axial retention. The clip and the key serve different purposes: an axial retaining feature does not replace the torque connection.
The nut must have positive axial retention. Do not treat friction from pressing a nut into its housing as a complete retention arrangement. The actual clip groove, flange fasteners, shoulders and assembly access must follow the approved mounting design. There is no universal bolt torque or clip-groove dimension for all four nut types.
Prepare the insertion jig for the correct series
Use an insertion jig and move the nut onto its matching shaft slowly. Do not strike the side plate or seal. Before starting, check that the shaft entry, jig and nut are clean, aligned and free of visible damage. Avoid using a housing fastener to pull a misaligned nut onto the shaft.
The table below lists the catalogue jig pilot diameter di. These are jig dimensions, not housing bore diameters, shaft diameters or fit allowances. The SO size column is a nominal designation. Select the series and nominal code first, then check the complete jig arrangement before use.
| SL nominal code | SL di | SO nominal code | SO di |
|---|---|---|---|
| 006 | 5.0 | 008 | 7.0 |
| 008 | 7.0 | 010 | 8.5 |
| 010 | 8.5 | 012 | 10.5 |
| 013 | 11.5 | 015 | 11.0 |
| 016 | 14.5 | 020 | 16.0 |
| 020 | 18.5 | 025 | 20.5 |
| 025 | 23.0 | — | — |
| 030 | 28.0 | — | — |
| 040 | 37.5 | — | — |
| 050 | 46.5 | — | — |
The pilot diameter is only one jig dimension. It does not specify the jig length, material, entry detail or manufacturing tolerance. Resolve those details for the selected assembly rather than making a production tool from this table alone.
Use a staged assembly check
- Identify the matched parts. Record the nut and shaft references, drawing revision and intended orientation. Do not mix a replacement nut with an unidentified shaft.
- Inspect the mounting interfaces. Check the housing bore, seating faces, keyway or flange pattern and retention features against the drawing. Remove burrs and contamination before assembly.
- Confirm service access. Identify the lubrication method and ensure it remains accessible with the housing and guards fitted. Obtain the selected assembly’s lubrication instructions before commissioning.
- Insert without impact. Align the jig, shaft and nut, and advance slowly. If movement catches, stop and check the entry, alignment and part identity before continuing.
- Secure and check movement. Complete the specified torque connection and axial retention. Under the machine’s commissioning procedure, check movement through the intended travel before applying the operating load.
Record the installation result
Record housing measurements, retention checks and sliding behaviour before and after final fastening. A new tight spot after fastening is a reason to check the mounting faces, bore and alignment. Do not try to remove it by increasing drive force. Record the position where it occurs so the assembly can be reviewed against the support layout.
Agree the acceptable sliding resistance, rotational clearance and measurement conditions for the supplied assembly. A visual inspection or a smooth hand movement does not establish the machine’s final accuracy or load capacity.
Download the installation record worksheet (CSV). Keep the completed record with the machine drawing and commissioning results.
For operating-load inputs, use the ball spline selection and load-case checklist. For ongoing service planning, see the existing maintenance cost and upkeep guide.
Review your mounting arrangement
Send the nut and shaft references, housing section, flange or keyway details and intended motion. Include the drawing revision and any measured tight spot or interface mismatch.